Sunday 21 August 2011

Tunnel electrics fitted. Propshaft fitted and wheel speed sensor fitted




I think I am completely finished in the transmission tunnel area now. I have enclosed all the elecrtris in spiral conduit and p-clipped and riveted it at close intervals for a tidy and secure job. The fuel pipes also clipped with rubber edged p-clips to avoid any chafing.
The propshaft was then bolted in position and the wheel speed sensor fit in a position to catch 1 of the 6 bolt heads on the prop as they spin!

No comments:

Post a Comment