my first job was to remove the engine from my honda s2000 and all parts needed for the build. the rest of the parts are to be sold to help fund the build.
once the engine was out it was time to get the kit at a good working height and well supported. i used a pair of axle stands at the front and a home made wooden horse at the rear. with the car sturdy the first job was to route brake lines from master cylinders to brake line T- peices. 4 way to front and 3 way to rear. the route was then marked,drilled and then pipes were riveted along floor and chassis rails. then brake pipes from T-peices to each corner using the same method,marking,drilling and riveting. with these in place i could then bolt the T-peices to the chassis and connect the brake lines!
No comments:
Post a Comment