i mounted the brake resevoir to the alloy bracket supplied by mnr with a large cable tie and riv nutted the alloy bracket to the footwell pannel.i then drilled a 20mm hole in the side pannel and fitted a 20mm grommet in the hole and fed the lambda sensor and wiring through the hole in a spiral flexible conduit and fed the lambda wiring and the brake fluid level wiring in the same conduit and p-clipped it along the scuttle pannel!
Saturday, 12 March 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment